Click here to go to the Home Page

The GBA takes the lead or contributes to projects and studies that work to assure San Joaquin County residents will have sustainable water supplies for today and the future. Projects and studies the GBA currently involved in include:

 

Integrated Regional Water Management Plan Preparation and Grant Proposal (2005)

City of Stockton Delta Water Supply Project Prop 50 Implementation Grant (2005)

5-year Joint Salinity Program (2004-2008)

Groundwater Management Plan Presentation (Sept 2004)

Eastern San Joaquin Groundwater Basin Groundwater Management Plan (2004)

AB 303 Application (2004)

SEWD Peters Pipeline Project Prop 13 Application (2003)

Groundwater Banking Authority System Plan (2002)

San Joaquin County Groundwater Data Center

IRWMP Technical Memorandum:  Potential Use of Unassigned Freeport Regional Water Project Pipeline Capacity (Aug 2006)